The reopening of the Forth Road Bridge has been voted by the public as the greatest civil engineering achievement of 2016.  Engineers worked around the clock to repair the fractured truss end-link which caused the closure.  Millar Callaghan director Roy Callaghan was proud to attend the awards ceremony at Westminster, alongside Amey Highways, as part of the winning team responsible for the repairs.