Cairngorm Funicular Railway Strengthening and Walkway
Situated in the 1,748 square miles of the UK’s largest national park, the Cairngorm Funicular…
Westfield Viaduct Replacement Pattress Plates
Originally Built in 1855, Westfield Viaduct has been unused to rail traffic since 1967. Vegetation…
Westburn Road Railway Bridge Strengthening
Following a detailed survey of the structure, it was decided that the existing railway bridge…
Base Camp Bridge Removal
Base Camp bridge was originally built in 1872 and spanned across the main Glasgow to…
Strathbungo Railway Footbridge New Deck and Repairs
The cast iron railway footbridge at Strathbungo was originally built in 1877 and for the…
Dunblane/Bridge of Dun Railway Bridge Refurbishment
We were awarded the contract to remove the existing pedestrian footbridge at Dunblane Railway Station.…
Glasgow Central Station Refurbishment
The major refurbishment and upgrading of the Central Bar and Bonopartes restaurant at Glasgow Central…
Newburgh Footbridge Replacement
When Newburgh Footbridge over the Edinburgh to Perth railway line required repair and refurbishment, the…
Cathedral Street Bridge Strengthening
Built in 1877 and forming the main support for the north side of the roof…
Waverley Station Liftshaft
During a 5 year refurbishment programme at Waverley Station, Edinburgh, there was a requirement to…
Forth Rail Bridge Jubilee Tower Access Platform
In November 2011 Millar Callaghan were asked to quote for the design and build of…
Forth Rail Bridge Access Platform
Built at the end of the 1800’s and officially opened on the 4th March 1890,…