Portfolio Category: Marine

South Viaduct Platform Refurbishment

Following a routine inspection of the south side viaduct platform on the Forth Road Bridge,…

Gantry Rail Replacement Forth Road Bridge

During a 2017 inspection of the existing gantry rails on the Forth Road Bridge, it…

Gourock Linkspan

The station and pier at Gourock opened in 1889 for pedestrian access only. It wasn’t…

Forth Road Bridge End Link Replacement

After the emergency repairs were completed to the damaged North East main span end link…

Kessock Bridge Tuned Mass Dampers

As a result of a series of upgrades and resurfacing works carried out on Kessock…

Dong Siri Oil Platform

During routine maintenance of the Dong Siri off shore oil platform (situated on the Danish…

Glasgow Nautical College

After several quality and safety meetings with the client, Millar Callaghan were awarded the contract…

Scotstoun Dock Gates

As one of the few remaining working shipbuilding yards in Scotland and with a healthy…