Renton Footbridge Refurbishment
Millar Callaghan were delighted to have been awarded the contract for the refurbishment of Renton footbridge.
This project had to be carried out with minimum disruption to the public and bridge users. After a detailed survey, fabrication drawings were presented to the client for approval.
All fabrication work was carried out at our Irvine workshop. On completion of fabrication a full trial assembly was carried out, to ensure that both sets of new access stairs could be quickly and efficiently installed on site.
Before going to site the new stairs were painted and an anti-slip surface was applied to the deck and stairs.
On site, both stairs were installed and secured to the existing bridge structure in one day.
Share
Categories
More Projects
Hammersmith Flyover Strengthening
The Hammersmith Flyover forms part of the A4 route connecting London to Heathrow Airport. This…
Forth Road Bridge Replacement Hangers
Since its construction in 1964 the Forth Road Bridge has undergone continuous maintenance and upgrading.…
Gourock Linkspan
The station and pier at Gourock opened in 1889 for pedestrian access only. It wasn’t…
Forth Road Bridge Expansion Joints
High volumes of traffic and natural wear and tear had taken their toll on the…